Contract
type |
|
This contract is based upon
a partnership/alliance agreement and an incentive scheme is associated
with the performance.
In addition to the provision
of production and maintenance services, the scope of work includes a
programme of Yemenisation involving the recruitment, selection and
training of all the basic production team.
|
 |
The
process |
|

|
Overview |
|
The East Shabwa Development
comprises pipelines for transporting produced crude oil, gas and water
mix to the central production facility at Kharir, a production facility
at Atuf-NW, and a gathering facility at Wadi Tariba. At each location
production water is removed and the crude oil is degassed.
Specification crude oil from
Kharir Central Production Unit is pumped in a 10" pipeline to the
Canoxy facility at Masila for export to the sea loading facility.
Specification crude oil from Atuf is delivered by 4" pipeline to
the 10" Kharir-Masila pipeline. Oil from Wadi Tariba is
pre-treated, then trucked to, and processed at Kharir.
|
 |
Station
Production (Design Flowrates) |
|
Barrels Liquids per day
Kharir 25,000 (18072 BOPD + 7236 BWPD)
|
 |
Export system |
|
Barrels Liquids per day
Kharir 30,000
|
 |
Crude Oil Shipping Pumps |
|
Capacity 2 x 2385 CMPD @ 47
bar g. net
(2 x 15,000 BOPD @ 681 psig.net)
|
|

|
Export system |
|
Kharir - Masila Pipeline
Diameter 10"
Length 47 km
Capacity 30,000 BOPD
|
 |
Scope
of services |
|
The scope of services
includes (but not limited to): |
 |
Review and endorsement of
all facilities dossiers from EPSCC Contractor |
 |
Preparation of all
policies, plans, manuals, procedures associated with the operations
of the specific facilities. |
 |
Acceptance of all facilities
at the end of the Commissioning tests and handover. |
 |
Start-up of production |
 |
Operations of wells and
processing of hydrocarbons. |
 |
Delivery of produced treated
oil to export facilities. |
 |
Systematic reporting to
Client. |
 |
Definition of spare parts
initial stock. |
 |
Definition and purchase of
all necessary consumables |
|
(diesel, water, production
chemicals, laboratory consumables, lubricants and greases). |
 |
Services of camp facilities
and all operations logistics. (emergency evacuation, transportation |
|
of personnel and equipment,
handling of materials, equipment, maintenance of tracks and
roads, communications, etc...).
|
 |
Key
Data Related to the Contract |
 |
The Operational Team is
constituted with 51 persons distributed as follows: |
 |
Twelve Persons Production Team |
 |
Nine Persons Maintenance Team |
 |
Fifteen Persons Logistics Team |
 |
Three Persons Safety and
Administration Team |
 |
Twelve Persons Catering Team |
 |
The vehicles fleet is total, 17 vehicles
|